Dryland Spacing Tests – Production Information – Halfway

Table 58. Production information for dryland performance test at the Halfway Experiment Station, 2000.
Test: Spacing Test
Planting date: June 2
Row spacing: 40-in
Planting pattern: Solid
Herbicide: Prowl @ 1 qt/A applied pre-plant
Fertilizer: 40-0-0 lbs/A applied July 14
Rainfall: April – September, 7.1 inches
Insecticide: Temik @ 2.4 lbs/A at plantingVydate @ 8 oz/A on July 3 and 10 for boll weevils
Harvest aids: Superboll @ 1 pt/A + Ginstar @ 6 oz/A on October 10
Harvest date: November 29
Freeze date: November 7

Comments are closed.