Table 48. Production information for irrigated performance test at the Halfway Experiment Station, 1999.
Test: Verticillium Wilt
Planting date: May 19
Row spacing: 40-in
Planting pattern: Solid
Herbicide: Treflan @ 1.25 pt/A applied before pre-plant irrigation
Fertilizer: 120-0-0 lbs/A applied June 28
Irrigations: 3.4 acres-in on April 21 (pre-plant)
(furrow) 2.1 acre-in on July 15
Insecticide: Temik @ 2.4 lbs/A at planting
Vydate @ 8 oz/A on July 7 and 13 for boll weevils
Bidrin @ 5.4 oz/A on July 27 for aphids
Harvest aids: Cotton Quik @ 3pt /A + Ginstar @ 3 oz/A on October 25
Cyclone @ 1 pt/A on November 2
Harvest date: November 8
Freeze date: November 24
Note: Stand of test plots was thinned due to a hailstorm on May 26.