Verticillium Wilt Resistance Test – Irrigated – Production Information – Halfway

Table 48. Production information for irrigated performance test at the Halfway Experiment Station, 1999.

 


 

Test: Verticillium Wilt

Planting date: May 19

Row spacing: 40-in

Planting pattern: Solid

Herbicide: Treflan @ 1.25 pt/A applied before pre-plant irrigation

Fertilizer: 120-0-0 lbs/A applied June 28

Irrigations: 3.4 acres-in on April 21 (pre-plant)

(furrow) 2.1 acre-in on July 15

Insecticide: Temik @ 2.4 lbs/A at planting

Vydate @ 8 oz/A on July 7 and 13 for boll weevils

Bidrin @ 5.4 oz/A on July 27 for aphids

Harvest aids: Cotton Quik @ 3pt /A + Ginstar @ 3 oz/A on October 25

Cyclone @ 1 pt/A on November 2

Harvest date: November 8

Freeze date: November 24

 

Note: Stand of test plots was thinned due to a hailstorm on May 26.

Comments are closed.