Table 10. Production information for irrigated performance test at the Western Peanut Growers Research Farm, Denver City, 2000. | ||||||
Test: | Cotton Variety | |||||
Planting date: | May 22 | |||||
Row spacing: | 36-in | |||||
Planting pattern: | Solid | |||||
Herbicide: | Prowl @ 3 pt/A by chemigation on May 25 | |||||
Fertilizer: | 30-0-0 lbs/A by chemigation July 8, 21 20-0-0 lbs/A by chemigation July 26 |
|||||
Irrigations: (center-pivot) |
May | June | July | August | September | October |
13-2.00 in. 23-.25 in. 25-.25 in. Total 2.5 |
6- .22 in. 8-.22 in. 10-.22 in. 14-.16 in. 16-1.00 in. 23-.22 in. 25-.22 in. Total 2.26 |
3-.25 in. 6-.25 in. 8-.25 in. 11-.40 in. 14-.25 in. 18-.25 in. 21-.25 in. 22-40 in. 24-.40 in. 26-.40 in. 27-.40 in. 28-.40 in. 31-.40 in. Total 4.30 |
2-.20 in. 5-.40 in. 7-.60 in. 9-.60 in. 11-.60 in. 16-.60 in. 18-.60 in. 24-.20 in. 28-.20 in. 30-.60 in. Total 4.6 |
1-.10 in. 3-.80 in. 5-.80 in. 9-.80 in. 11-.80 in. 14-.80 in. 18-.25 in. 19-.25 in. 22-.25 in. 24-.50 in. 26-.60 in. 29-.60 in. Total 6.55 |
2-.90 in. 4-.90 in. Total 1.80 |
|
Insecticide: | Denim @ 7 oz/A on July 14 for armyworms Steward @ 10 oz/A on July 29 and August 17 for armyworms Leverage @ 3 oz/A + Lorsban @ 24 oz/A on August 9 for armyworms Boll Weevil Eradication Program applied Fyfanon ULV on July 28 September 14 22 28 October 12 18 and 30. |
|||||
Harvest aids: | Prep @ 1.33 pt/A + Def @ 0.33 pt/A + Ginstar @ 5 oz/A on October 17 | |||||
Harvest date: | November 21 | |||||
Freeze date: | November 7 |