Table 15

Table 15.  Expenses incurred for the Tokio systems trial, 2002.
 Variety Seed
cost/bag
Tech
fees/bag
Total
cost/bag
Seed &
tech fee/ac
Herb
apps
Herb app
cost/ac
Roundup
cost/ac
Fusion spot spray
cost/acre
Hoe
cost/ac
Insecticide app
cost/acre
Karate for worms
cost/acre
Systems
cost/ac
1 PM 2266RR 43.45 26.20 69.65 19.50 1 3.50 10.57 0.00 4.50 3.50 6.06 47.63
2 PM 2326RR 43.45 26.20 69.65 19.50 1 3.50 10.57 0.00 4.50 3.50 6.06 47.63
3 PM 2280BG/RR 49.45 82.70 132.15 37.00 1 3.50 10.57 0.00 4.50 0.00 0.00 55.57
4 PM 2344BG/RR 49.45 90.30 139.75 39.13 1 3.50 10.57 0.00 4.50 0.00 0.00 57.70
5 SG 215BG/RR 65.45 97.00 162.45 45.49 1 3.50 10.57 0.00 4.50 0.00 0.00 64.05
6 DP 555B/RR 77.45 124.52 201.97 56.55 1 3.50 10.57 0.00 4.50 0.00 0.00 75.12
7 ST 2454R 42.00 28.00 70.00 19.60 1 3.50 10.57 0.00 4.50 3.50 6.06 47.73
8 ST 3539BR 45.00 90.30 135.30 37.88 1 3.50 10.57 0.00 4.50 0.00 0.00 56.45
9 All Tex Atlas RR 38.75 26.20 64.95 18.19 1 3.50 10.57 0.00 4.50 3.50 6.06 46.31
10 FM 989BR 68.95 87.00 155.95 43.67 1 3.50 10.57 0.00 4.50 0.00 0.00 62.23
11 FM 989 63.95 0.00 63.95 17.91 0 0.00 0.00 7.76 18.00 3.50 6.06 53.23
12 FM 958 63.95 0.00 63.95 17.91 0 0.00 0.00 7.76 18.00 3.50 6.06 53.23
13 AFD 2050 29.60 0.00 29.60 8.29 0 0.00 0.00 7.76 18.00 3.50 6.06 43.61
14 AFD Raider 271 29.60 0.00 29.60 8.29 0 0.00 0.00 7.76 18.00 3.50 6.06 43.61
15 PM HS26 43.45 0.00 43.45 12.17 0 0.00 0.00 7.76 18.00 3.50 6.06 47.49
14 lb seed/ac 3.50/ac 50.49/gal Includes 1.76/ac chem 6.00/hr 388.15/gal
cost + 6.00/ac application
includes AMS Time spent Hoeing
at 0.31/ac 0.75 hr/ac on RR
Base weed control program chem cost app cost total cost 3.0 hrs/ac on Conv.
Roundup Ultra Max Total Approx Hrs Karate rate
Pre and At-Planting rate at 26 oz/ac hoeing = 90 at 2.0 oz/ac
1-Apr 1 pt/acre Treflan 3.45 3.50 6.95 on 7-Jul
9-May 4 oz/acre Treflan plus 0.86 3.50 4.36
8 oz/acre Caparol at plant 1.92 1.92
on 12″ band
18-Jun Blanket cultivation 5.00 5.00
24-Jul Blanket cultivation 5.00 5.00
Total blanket weed control program 23.24
PGR Program
8-Jul 2.0 oz/acre Pix banded over top 2.90 3.50 6.40
with .50% v/v NIS
Insecticide program
9-May 3 lb/acre Temik at plant 10.23 10.23
8-Jul 0.5 oz/acre Intruder with Pix 4.58 4.58
see above
12-Aug 3.4 oz/acre Leverage for worms 10.56 3.50 14.06
by airplane
BWEP assessment 12.00
Harvest aid program
3-Oct 1.3 pt/acre Finish 6 + 7 oz/acre Ginstar 25.30 3.50 28.80
10-Oct 12 oz/acre Cyclone Max 4.86 3.50 8.36
with 0.5% v/v NIS
Total blanket input cost ($/acre) 107.66

Comments are closed.